Introduction to 492 and Decoupling
Software is Still Buggy
IBM survey, 1994
55% of systems cost more than expected.
68% overran schedules.
88% had to be substantially redesigned.
Advanced Automation System, FAA, 1982-1994
Industry average was $100/line, expected to pay $500/line.
ended up paying $700-900/line.
$6B of work ended up discarded.
Bureau of Labor Statistics,1997
for every 6 systems put into operation, 2 canceled
probability of cancellation is about 50% for biggest systems.
average project overshoots schedule by 50%
3/4 systems are regarded as operating failures